Your name goes on the finished room, so everything we add to it disappears into the architecture: controls where your drawings put them, speakers out of sight. Our own people do the work, from the first plan review to the service visits years later.
You've earned your client's trust. We're the specialist you bring in to handle the technology, hold your timeline, and disappear into your work, so the result reflects on you. Here's what that looks like, by role.
Your relationship with the client outlasts the closing, so the people you hand them to should too. Whether they're building or just got the keys to a house whose last system was someone else's problem, we walk the home or the plans first, tell them where every dollar goes before they spend it, and stay on for the life of the house: our own people from design through service, one number to call. When your client mentions the house a year later, it's a story you're glad your name is on.
You've seen what a technology sub can do to a wall you spent weeks composing: a bank of toggles, a thermostat at the wrong height, a speaker grille arguing with the sconce line. We work the other way around. We ask for the finish schedule before rough-in, set the keypads level and centered against it, and program each one to its room. Shades mount inside the window frame on most projects, sized to the opening, so the window still reads as a window. The room you shoot at reveal is the room your client lives in.
We come in early, work to your plans, and flag conflicts before they cost anyone time.
Your timeline is our timeline. We sequence around your schedule, not ours.
The client gets a system that works and a partner who stays on. You get the credit.
Send the plans or send the client, whichever you have. We meet them, walk the home or the drawings, and design around how they live, then our own crews run every wire and set every finish detail against your documents. We train the family until the system is theirs, then keep servicing it. We'll keep you in the loop as much or as little as you want, from a note every week to nothing until handoff.
Make an introduction